| Video Clip | Event/Process Description | Outcome achieved via 20/20 Hindsight High Speed video Application |
 | A cap comes down the feed chute upside down, causing an upset in the capping process. | Improved Line Speed and Efficiency |
 | Conveyor belt with some misaligned sections causes a bottle to tip over and fall off the production line. | Reduced Waste |
 | Timing issues cause the doses to bounce off the edge of the vials resulting in a QAQC problem. | Improved Quality Control |
 | Tablet falls out of holder. | Reduced Operator Intervention |
 | Machine attempts to dispense two pill bottles into one slot. | Reduced Maintenance Costs |
 | Carton glue gun timing is off. | Production Cycle Time Reduction |
 | Insert jamming. | Reduced Machine Malfunctions |
 | Pill package assembly dropped from packaging line. | Minimized Downtime |
 | Caps being applied to vials on a pharmaceutical packaging line and two caps cause a jam. | Reduced Operating Costs |
 | Tablet Press problem. | Minimized Downtime |